Quick Link
Quick Contact
Address
No. 462, Jing-Gao South Road, Gaoling District, Xi'an City, Shaanxi Province, China
Tel
86-29-86938788
Our Newsletter
Subscribe to our newsletter for discounts and more.
Solids Control Shale Shaker
The shale shaker is the first class solids control equipment in the drilling mud system, and also the core equipment for the solids control system, from the number of equipment: single shale shaker, dual tandem shaker, triple tandem shaker, quintuple tandem shaker; from the number of screen decks: single deck, double deck, three decks; from the running track: high frequency cyliner, flat elliptic, composite trajectory shake shaker.
Product Parameters
| Model | HDZS584 | HDZS583 |
| Vibrating Moter | Linear Motion | Linear Motion |
| Vibration Moter | 2×1.72/1.865/2.2kw | 2×1.5/1.72/1.865kw |
| G-Force | ≤7.8G(Adjustable) | ≤7.8G(Adjustable) |
| Double Amplitude | 6.0-7.2mm | 6.0-7.2mm |
| Treating Capacity | 113-136m³/h(500-600GPM) | 100-120m³/h(400-500GPM) |
| Deck Ange | -1°-5° | -1°-5° |
| Normal Power | 380V/50Hz,460v/60Hz or Customized | 380V/50Hz,460v/60Hz or Customized |
| Screen Area | 2.72m² | 2.04m² |
| Screen of Qty | 4panels | 3panels |
| Weir Height | 750mm | 750mm |
| Starter | Magnertic Starter | Magnertic Starter |
| Decibels | <85db | <85db |
| Weight | <1680kg | <1600kg |
| Dinension | 2920×1780×1450mm | 2345×1780×1500mm |
| Remarks | Treating capacity test from mud:1.2cm³ density &viscosity 45s&screen40mesh | |
Product Advantage
1.High screening efficiency, excellent solid-liquid separation performance
2.Large processing capacity for high-flow drilling operation
3.Stable vibration, low noise and long service life
4.uick screen replacement, low maintenance cost
5.Wear-resistant screen mesh & anti-corrosion screen frame
6.Compact structure, easy to match with mud tank skid system
7.Adjustable screen angle to fit different mud properties
8.Enclosed splash-proof design, eco-friendly for oilfield sites
FAQ
Q1. Can products be customized according to our working conditions?
A: Yes. We support customized size, capacity, material, explosion-proof configuration and skid structure based on your site requirements.
Q2. How long is the production lead time?
A: Standard models take 7–15 working days; customized equipment needs 15–30 working days.
Q3. What kind of anti-corrosion treatment do you adopt?
A: Sand blasting + epoxy zinc-rich primer + oil-resistant topcoat; support hot-dip galvanizing for brackets.
Q4. Are all accessories complete when delivered?
A: Yes. Standard matching parts like valves, gauges, pipelines and guardrails are fully equipped as listed.
Q5. Do your products meet oilfield explosion-proof standards?
A: All electrical parts, grounding and sealing structures comply with oilfield explosion safety specifications.
Q6. What after-sales service can you provide?
A: We supply installation guidance, operation manuals, spare parts supply and online technical support.