Oilfield Drilling Mud Cleaning Machine For Solid Control System

Place of Origin: China
Brand Name: HonDin
Certification: ISO9001, ISO14001, ISO45001
Model Number: SMC240,QJZS210,QJZS316
Minimum Order Quantity: 1Set
Price: Negotiable
Packaging Details: Export Standard Wooden Case
Delivery Time: 30days
Payment Terms: L/C,D/A,D/P,T/T
Inquiry Now
Get A Quote
Specifications
Highlight Features

Drilling Mud Cleaning Machine

,

Oilfield Mud Cleaning Machine

,

Solid Control Mud Cleaning Machine

Modol:
SMC240,QJZS210,QJZS316
Capacity:
240m³/h~360m³/h
Power Source:
Electric
After-sales Service:
One-Year Warranty
Warranty Period:
12months
Desilter Cones  :
16×100mm/16×4"(customization)
Vibrating Mode:
Linear Motion
Screen Area  :
2.73m²
Materia:
Carbon Steel
Color:
Customization
MOQ:
1Set
Product Description
Mud Cleaner for Solid Control System
Hondin mud cleaner is the second and third-class solids control equipment to deal with drilling fluids, combining desander cyclone, desilter cyclone, and an underset shale shaker together. Its compact structure, small size, and powerful performance make it the ideal choice for second and third-class solids control equipment.
Detailed Photos
Mud cleaner equipment overview showing complete assembly
Close-up view of mud cleaner components and construction
Technical Specifications
Model SMC240 QJZS210 QJZS316
Capacity 240m³/h 240m³/h 360m³/h
Desilter Cones 16*100mm/16*4" 10*100mm/10*4" 16*100mm/16*4"
Desilter Cones 2*300mm/2*12" 2*250mm/2*10" 3*300mm/3*12"
Vibrating Mode Linear Motion
Matching Shaker HDZS584 HDZS583 HDZS584
Shaker Motor 2*1.72/1.865/2.2KW 2*1.5/1.72/1.868KW 2*1.72/1.865/2.2KW
Screen Area 2.73m² 2.04m² 2.73m²
Screen of Deck 4 panels 3 panels 4 panels
Remarks: Each 4" Cone = 50-75 GPM, 10" Cone = 400-528 GPM
Product Advantages
  • High degassing efficiency, thoroughly removes gas from drilling fluid
  • Large handling capacity, stable vacuum system for continuous work
  • Built-in stirring device to break mud bubbles completely
  • Good sealing structure, no mud splash, clean working site
  • Low noise, stable operation, 24-hour non-stop running
  • Wear & corrosion resistant, easy to install and maintain
  • Protects downstream solid control equipment, extends service life
  • Compact size, small floor space, convenient to move
Frequently Asked Questions
Q1. Can products be customized according to our working conditions?
Yes. We support customized size, capacity, material, explosion-proof configuration and skid structure based on your site requirements.
Q2. How long is the production lead time?
Standard models take 7–15 working days; customized equipment needs 15–30 working days.
Q3. What kind of anti-corrosion treatment do you adopt?
Sand blasting + epoxy zinc-rich primer + oil-resistant topcoat; support hot-dip galvanizing for brackets.
Q4. Are all accessories complete when delivered?
Yes. Standard matching parts like valves, gauges, pipelines and guardrails are fully equipped as listed.
Q5. Do your products meet oilfield explosion-proof standards?
All electrical parts, grounding and sealing structures comply with oilfield explosion safety specifications.
Q6. What after-sales service can you provide?
We supply installation guidance, operation manuals, spare parts supply and online technical support.
Related Products
Send An Inquiry