اتصال سريع
العنوان
رقم 462، طريق جينغ-جاو الجنوبي، منطقة غاولينغ، مدينة شيآن، مقاطعة شنشي، الصين
الهاتف
86-29-86938788
البريد الإلكتروني
fancy@hondinchina.comنشرتنا الإخبارية
اشترك في نشرتنا الإخبارية للحصول على خصومات وأكثر.
2026-10-14
Project Overview
During oil and gas drilling operations, drilling fluid continuously carries rock cuttings and other solid particles to the surface. Effective solids control is essential for maintaining drilling fluid performance, protecting downstream equipment, and supporting continuous drilling operations.
HONDIN provided an integrated mud purification system designed to support drilling fluid treatment, storage, and recirculation at the drilling site.

System Configuration and Design
The project features large mud tanks, integrated processing equipment, circulation connections, and elevated access platforms with safety railings. The equipment layout brings the main treatment and fluid-handling components together in an organized system.
The configuration can be tailored to project requirements and may incorporate shale shakers, desanders, desilters, mud cleaners, pumps, and other solids-control equipment as required.
Key design considerations include:
Multi-stage solids separation: Removing drilled cuttings and suspended solids through an appropriate treatment sequence.
Integrated mud circulation: Connecting treatment equipment, storage tanks, and fluid-transfer systems into a coordinated workflow.
Operational accessibility: Providing access platforms and walkways for routine inspection, operation, and maintenance.
Project-specific configuration: Arranging equipment according to drilling conditions, available space, and process requirements.

Application Value
An integrated solids control system helps maintain drilling fluid quality throughout the drilling cycle. By removing unwanted solids and returning reusable drilling fluid to the circulation system, it supports more efficient fluid management and reduces the solids load on downstream equipment.