This high efficiency hydrocyclone desander removes sand particles of 45-75 microns from drilling fluids as second-stage solids control equipment. Polyurethane hydrocyclones with 8-12 inch cones and 240-1200 GPM capacity improve mud performance and reduce wear.
500BBL frac tank for oilfield fluid storage. Skid-mounted for fixed sites or truck-mounted for rapid deployment. Heavy-duty steel, corrosion-resistant coating, custom sizes & accessories. Built for durability and fast setup.
We can design and manufacture mud tank, water tank and oil tank of FG, ZG, YG types according to the customer's requirements. The tank body is structured as a panel or corrugate. the tank, walkway, and stairs are made of skid‑proof steel sheet and galvanized steel sheet produced by professional ...
We can design and manufacture mud tank, water tank and oil tank of FG, ZG, YG types according to the customer's requirements. The tank body is structured as a panel or corrugate. the tank, walkway, and stairs are made of skid‑proof steel sheet and galvanized steel sheet produced by professional ...
High Efficiency Oil and Gas Field Enhancement System with customizable configurations (skid/trailer/truck-mounted). Features hydraulic fracturing up to 140 MPa, acidizing, nitrogen injection, and automated PLC control. API/ISO/CE certified with 1-year warranty.
This oil and gas field enhancement system boosts well production through hydraulic fracturing, acidizing and nitrogen injection. Skid, trailer or truck-mounted units deliver up to 140 MPa with 6,000 HP for onshore and offshore operations.
This integrated drilling waste management system treats waste mud and cuttings through recycling-first, compliance-based disposal. It combines shale shakers, screw conveyors, vertical cuttings dryers and decanter centrifuges to recover drilling fluid and reduce waste volume.
This HDD drilling mud desander removes 47-76micron sand particles as second-stage solids control equipment, featuring polyurethane hydrocyclones, 240 m³/h capacity and 0.21-0.4MPa working pressure for oil and gas and HDD drilling.
This HDD drilling mud desander removes 47-76micron sand particles as second-stage solids control equipment, featuring polyurethane hydrocyclones, 300 m³/h capacity and 0.21-0.4MPa working pressure for oil and gas and HDD drilling.